honed hydraulic tube

FOB Reference Price:Get Latest Price
  • 5 - 9 Tons
    $1,480.00
  • >=10 Tons
    $1,450.00
Lead Time:
Quantity(Tons) 1 - 10 11 - 20 >20
Est. Time(days) 70 60 Negotiable
Customization:
Customized logo (Min. Order: 10 Tons)
Customized packaging (Min. Order: 10 Tons)

More

Graphic customization (Min. Order: 10 Tons) Less
Report Suspicious Activity
Overview
Quick Details
Standard:
BS, DIN
Standard2:
BS 6323, DIN 2391, DIN EN 10305
Grade Group:
10#-45#, 16Mn, Cr-Mo alloy, Q195-Q345, ST35-ST52
Grade:
20#, 45#, 16Mn, 34CrMo4, 30CrMo, Q345, St52, St45
Thickness:
4 - 50 mm
Section Shape:
Round
Outer Diameter(Round):
40 - 600 mm
Place of Origin:
Jiangsu, China (Mainland)
Application:
honed tube
Technique:
Cold Drawn
Certification:
ISO9001-2008
Surface Treatment:
Internal surface honing
Special Pipe:
Thick Wall Pipe
Alloy Or Not:
Non-alloy
Secondary Or Not:
Non-secondary
Product name:
honed hydraulic tube
Supply Ability
Supply Ability:
25000 Ton/Tons per Year
Packaging & Delivery
Packaging Details
Seaworthy export packing for honed steel tube
Port
Shanghai Port for honed steel tube
Lead Time :
Quantity(Tons) 1 - 10 11 - 20 >20
Est. Time(days) 70 60 To be negotiated
Product Description

1. Manufacture Method: Cold drawn, hot rolled+deep hole bored

2. Size: 40mm*30mm - 600mm*500mm

3. Standard: DIN2391-2,EN10305-1,ASTM A519

4. Certification: ISO9001, SGS, 

Product Name:
honed hydraulic tube for hydraulic cylinder
Material:
Carbon steel,alloy steel, stainless steel
Standard&Grade:
DIN2391-2 ST52,EN10305-1 E355,C45E,25CrMo4,42CrMo4, CK45,E410, E470,ASTM A519 SAE1020,SAE1026,SAE1045,SAE1518,SAE1541, SAE4130,SAE4140,SAE4145,SAE4340,etc.
Manufacture Method:
Cold Drawn, Hot rolled+Deep Hole Bored
Internal Surface Treatment:
Honing, Skiving&roller burnishing
Size Range:
ID of 300mm max for cold drawing, ID of 500mm for deep hole boring
Delivery Condition:
As rolled, Stress relieved,Annealed,Normalized,Quenched+Tempered
ID Tolerance:
ISO H8
Bore Roughness:
Ra0.35um max for honed tubes, Ra0.25um Max for Skived&roller burnished tubes
End finish:
Plain  ends with square cuts,free of burrs
Usage:
Hydraulic cylinder, Pneumatic Cylinder
Products Show
Our Service

Marking

Marking or mechanical steamp on each piece of tube

External surface polishing

We can do polishing to external surface of tubes

Hard Chrome plating

We can do hard chrome plating ro internal surface of tubes

Our Company

Factory gate

Our Factory

Workshop-1


Workshop-2

Raw Material Stock

workshop-3


Packing & Delivery

Packing Details  : Tubes packed in bundles tied with steel strips. Internal&external oil coating. End plastic caps. External packing by PVC bags and knit bags.

Delivery Details : Regular lead time is around 30-45 days.

Container loading: container loading by forklift in our workshop.

1. Regular packing
2. Regular packing
3. External packing
4. Container loading
5. Container loading
6. Container loading
Our Certifications
Customer Photo
FAQ

Q: Are you trading company or manufacturer ?

A: We are specialized manufacturer

Q: How long is your delivery time?

A: Generally,it takes us 40-60 days depending on sizes of honed tube. 

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Deposit+balance before shipment,if order value is below USD20000. T/T or L/C is order value is above USD20000. For end users with long term demand,payment method can be discussed. 


Q: How do you ensure quality?

A: We only use raw material for honed tube from leading steel mills like TPCO,Hengyang Valin,Baosteel,etc. 

We only use raw material for honed tube with cylinder quality.

We inspect honed tube as cylinders itself, because we know each piece of tube means one or more pieces of cylinders. 

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like